ST. THOMAS’ HOSPITAL

This is another example of our work with Guy’s & St. Thomas’ Trust. In this instance the project relates to refurbishment and maintenance.

The project was to refurbish laboratories dedicated to the pharmacology and histopathology departments. As with most of our work in the Health Care environment, St. Thomas’ was fully operational during the works so great care was taken to ensure throughout the project that patient and visitor disruption were kept to a minimum.

Apart from the refurbishment of the two laboratories the Sure Consulting was commissioned to undertake maintenance work on a range of equipment in the Hospital.

Related Projects

Helping you with the impossible

Call us on 01372 365 040

Banner Sure Consulting (13)